


Scheduled Commissioning Date or “SCD” of the Project shall mean ……………… In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.
ASME B 31.8 FREE DOWNLOAD UPDATE
"LC" means Letter of Credit"LC" means Letter of CreditĬost-plus-a-percentage-of-cost contract means a contract that, prior to completion of the work, the parties agree that the fee will be a predetermined percentage of the cost of the work.Īdmin Fax Ext Admin Email: Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 123 EXAMPLE STREET Tech City: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: Name Server: Name Server: DNSSEC: signedDelegation DNSSEC: unsigned > Last update of WHOIS database: > Last update of WHOIS database: > Last update of WHOIS database: <<< The format of the following data fields: domain status, individual and organizational names, address, street, city, state/province, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood.

L2 etc" means First or second Lowest Offer etc. L2 etc means First or second Lowest Offer etc."L1. NI 52-109 means National Instrument 52-109 – Certification of Disclosure in Issuers’ Annual and Interim Filings Ĭommissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences NI 81-102 means National Instrument 81-102 Investment Funds of the Canadian Securities Administrators, as it may be amended or replaced from time to time. NI 41-101 means National Instrument 41-101 – General Prospectus Requirements H1, H2 etc means First Highest, Second Highest Offers etc. NI 51-101 means National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities NI 51-102 means National Instrument 51-102 – Continuous Disclosure Obligations 419/05 means the Ontario Regulation 419/05, Air Pollution – Local Air Quality. The hydrostatical test will be for a minimum of twenty four hours and will be conducted as per the internationally accepted standard for high pressure pipeline design construction and testing in the above standard and those specifics to pipelines on land will be referred to ASME B 31.8.Īcceptance criteria shall be as be ASME B 31.4 or ASME B 31.8 as applicable and API 1104.
ASME B 31.8 FREE DOWNLOAD CODE
Similar nature of jobs means construction of oil and gas pipelines of size 12” NB or above as per ASME B 31.4 / ASME B 31.8.ĪSME B 31.8 – Gas Transmission and Distribution Piping SystemsASME B31.8 Gas Transmission and Distribution Piping Systems - This code covers the design, fabrication, installation, inspection, and testing of pipeline facilities used for the transportation and distribution of gas, including natural gas. Weld repair areas shall be subjected to additional radiography or ultrasonic testing after repair.Schedule – 1C PIPING SYSTEM COMPONENTS AND FABRICATION DETAILS PIPING SYSTEM COMPONENTS General In addition to standards and specifications covered under ASME B 31.8 for various piping components, piping components manufactured conforming to standards and specifications listed under Annexure–I of this standard shall also be acceptable. In case of difference in thickness of matching ends, requirements of ASME B 31.8 shall apply.Ībove 120☏ (50 degree centigrade) or temperature at which long term hydrostatic strength used in design formula in para 842.31 of ASME B 31.8 is determined, (whichever is lower).Minimum thickness shall not be less than 2.3 mm.

MATERIAL SPECIFICATIONS In addition to standards and specifications covered in ASME B 31.8, standards and specifications listed in Annexure-I shall also be acceptable for manufacturing of various piping components forming part of the CGD network. The CGD system downstream of city gate station shall have been tested initially at the time of commissioning in accordance with ASME B 31.8 Chapter IV (with minimum test pressure of 1.4 times of MAOP for steel network and 1.4 time MAOP or 50 PSI whichever is higher for PE network). These regulations also cover safety aspects of operation and maintenance of CGD network and the requirements covered herein these regulations are meant to supplement the safety requirements already covered under ASME B 31.8.
